0A unique aspect of this project
is that different tunneling methods were used along the alignment, which
yielded many valuable lessons on the impact of these methods on the structures
above. The portion of work for which Jacobs Associates was responsible
can be broken down into three distinct areas: NATM Tunnels, Río
Piedras Station - Stacked Drift Tunnel, EPB Tunnels
|