|

00Different alignments, construction methods, and techniques were considered to develop a design that minimizes construction impacts in the rural, suburban and urban environments through which the tunnel alignment passes.
00During the construction of the MetroWest Water Supply Tunnel, Jacobs Associates was responsible for ensuring that final linings installed were continuously compatible with ground conditions encountered. This work was performed as tunnel and shaft design engineering services in support of the construction manager.
|