00Key technical issues for the project included a construction schedule that had to conform to the operating requirements of the active drinking water reservoir, the seismic design of the underground facilities, the assessment and control of water infiltration, corrosion protection for permanent rock support, water quality criteria, the effects of blasting adjacent to existing facilities, underwater blasting and excavation and disposal of dredged material.
|