About People and Projects Brief Introduction Current Opportunities What We Do Current & Past Projects Publications Call or Write Jacobs Associates Home Page


M5 East Tunnels: A Flat Roofed, Bolt and Shotcrete-Lined Highway

2001

Daniel N. Adams
Jacobs Associates

Manfred K. Lechner

Baulderstone Hornibrook/Bilfinger + Berger JV

Isabelle Lamb
Hyder Consulting

 


Sydney Australia’s M5 East Motorway connects southwestern suburbs to the airport. Central to the project are twin 3.8 km roadway tunnels which are mostly driven through rock. In order to come up with the winning tender, the project team developed several unique approaches for tunnel excavation and support. The project’s flat roof with thin shotcrete lining, 20 m wide underground intersections, thixotropic-grout sheathed rockbolts and cablebolts, and new shotcrete testing methods all differ significantly from traditional concepts. This paper presents the design basis and construction methods used to achieve the 100-year design life required by the project’s owner.