Getting the Right Contract Package
Abstract
Construction projects may be delivered under one contract package or multiple packages divided by discipline, geographic location, or other characteristics. Dividing the construction into contract bid packages is called contract packaging, and is a vital and strategic aspect of effectively delivering tunneling projects. The process of contract packaging considers many factors, including the type of project, location, and owner’s priorities.
This paper describes the key facets of the contract packaging process used recently on several tunnel projects, reports, where possible, on the success of the process, and concludes with recommendations for applying this process to achieve the right contract package.
2008
North American Tunneling Conference (NAT) Conference Proceedings
William W. Edgerton
Jacobs Associates
Gregg Davidson
Jacobs Associates