Design Evaluations for the San Vicente Pipeline Tunnel

Abstract
The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variable geologic conditions consisting of strong granitic and metamorphic rocks, weak sedimentary rocks, abrasive conglomerates, and mixed face conditions. This paper discusses the challenging geologic conditions and some of the key design evaluations for the project. Currently design work for the project has been completed and construction will be underway by mid-2005.

Download this article (pdf)

2005
Rapid Excavation Tunneling Conference (RETC) Proceedings

Steve Klein
Jacobs Associates

Dave Hopkins
Jacobs Associates

Mike McRae
Jacobs Associates

Zach Ahinga

San Diego County Water Authority

©2012 Jacobs Associates, All Rights Reserved Worldwide.   Legal Disclaimer