Chattahoochee Tunnel

Abstract
This paper discusses the overall challenges to construct a 15,125.7 m (49,625 LF), wastewater drainage tunnel in Cobb County, Georgia by a joint venture of Gilbert Southern Corp. and S.A. Healy Co. and a construction manager Parsons, with Jacobs Associates as a subcontractor. The goal of the project is to provide wastewater retention during peak usage and is connected to a treatment facility near the Chattahoochee River. The primary component of the project is the TBM-driven hard rock tunnel. Additional works include drill and blast areas; four intake interceptors, two construction shafts and a 33.5 m (110 ft), diameter pump station shaft.

Download this article (pdf)

2003
Rapid Excavation Tunneling Conference (RETC) Proceedings

Richard W. Kimball
Kiewit Construction Company

Fred B. Estep
Parsons

Dwayne E. Easterling
Jacobs Associates