Portland, Oregon’s Alternative Contract Approach to Tackle a Complex Undergound Project

Abstract
This paper discusses the process utilized by the City of Portland Oregon’s Bureau of Environmental Services (BES) to procure and compensate Impregilo-SA Healy (I/H) for the West Side Willamette River Combined Sewer Overflow (CSO) Project. The contract method is a three-phase process consisting of qualifications based contractor procurement, pre-construction phase design assistance/construction planning, and facility construction where the contractor is compensated on a cost reimbursable-fixed fee basis.

The paper focuses on pre-construction phase lessons learned from the development of the contract general conditions, establishment of a construction budget and cost control program, incorporation of contractor recommended design changes, and development of a subcontractor procurement program for construction.

Download this article (pdf)

2003
Rapid Excavation Tunneling Conference (RETC) Proceedings

Greg Colzani
Jacobs Associates

Paul Gribbon
City of Portland, Bureau of Environmental Services

Gary Irwin

City of Portland, Bureau of Environmental Services

Glenn Boyce

Parsons Brinckerhoff Quade and Douglas

Jim McDonald

Impregilo-S.A. Healy Joint Venture

©2012 Jacobs Associates, All Rights Reserved Worldwide.   Legal Disclaimer