Articles

The underground engineering and construction industries rely heavily on past experience and new technologies. It is our philosophy that we can best serve our clients by contributing to this experience base through active participation in professional organizations and by publishing technical and management papers in various industry forums. We are pleased to offer a selection of our published papers, and welcome your feedback and exchange of ideas.

Microtunnel Jacking and Receiving Shafts Constructed Using Cutter Soil Mixing (CSM)… 2010
Bay Tunnel—Design Challenges 2009
Contingency Planning for Microtunneling: An Essential Activity 2009
Design Considerations and Evaluation Process for a New Tunnel and Ocean Outfall Project… 2009
Feasible Tunnel Construction Options for The Systems Conveyance & Operations Program… 2009
Geotechnical Baseline Reports—A Review 2009
NATM Strategies in the U.S.—Lessons Learned from the Initial Support Design for… 2009
Peanuts and Tunnel Stuffing—The Brightwater Conveyance System East Contract 2009
Pipe Ramming a 60-In. Casing Under BART 2009
Pipe Ramming Under Three Active Railroad Lines in Difficult Soil Conditions 2009
Selection, Design, and Procurement of North America’s Largest Mixshield TBM for… 2009
The Longest Drive—Portland's CSO Microtunnels 2009
Tunnel Construction Issues with San Francisco's New 44-In. Water Main 2009
Underground Construction for a Combined Sewer Overflow System in Providence, Rhode… 2009
Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking… 2008
Design of NATM Initial Support on the Caldecott 4th Bore 2008
Design of the University Link Tunnels and Stations 2008
Effect of Weathering on Strength and Modulus of Basalt and Siltstone 2008
Geotechnical Conditions and TBM Selection for the Bay Tunnel 2008
Getting the Right Contract Package 2008
Napa Valley Wine Caves 2008
NATM/SEM Analyses for San Francisco’s Transbay Extension Tunnel 2008
Northern Sewerage Project—Liner Selection in a Corrosive Environment 2008
Precast Concrete A Unique Application 2008
Raw Water Tunnel Condition Assessment 2008
Recommended Contract Practices for Underground Construction 2008
San Francisco Tunnels: Past, Present and Future 2008
Seismic Analyses of the Bay Tunnel 2008
The Great Salt Lake Causeway—Its Recent History and Current Maintenance Program… 2008
Seismic Design Evaluation of the Bay Tunnel 2008
The Need for Fair Contracts 2008
Tunnel Design and Construction in a Franciscan Melange 2008
Underground Construction Photography: Documenting a Success Story 2008
Utilization of Strain Measurements on Shielded Tunnel Boring Machines 2008
Construction of a Mixed Face Reach through Granitic Rocks and Conglomerate 2007
Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, RI… 2007
Evaluation of Large Tunnels in Poor Ground—Alternative Tunnel Concepts for the… 2007
Excavation and Support of a Water Tunnel through the Hayward Fault Zone 2007
Joint Water Pollution Control Plant Tunnel and Ocean Outfall Project 2007
Microtunnelling to Help Clean up Portland’s Willamette River 2007
New Test Methodology for Estimating the Abrasiveness of Soils for TBM Tunnelling 2007
Planning and Design of the Bay Tunnel 2007
Portland, Oregon’s Alternative Contract Approach—A Final Summary 2007
Preliminary Design of the Caldecott Fourth Bore 2007
Responsibility: Why We Don't 'Just Do It' 2007
Transbay’s Downtown Rail Extension 2007
Global and Structural Stability Assessments of Fort Mason Tunnel for Seismic Rehabilitation… 2006
Role of Engineering Geology on Rehabilitation of Likelike Highway Wilson Tunnel 2006
Design Evaluations for the San Vicente Pipeline Tunnel 2005
Design of the Brightwater Conveyance Tunnels 2005
King County's Project Delivery Approach for the Brightwater Project 2005
Pre-Excavation Grouting Design Guidelines for Hard Rock Excavations 2005
Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer Project… 2005
Seismic Design Measures for the Retrofit of the Claremont Tunnel 2005
Trapezoidal Tapered Ring—Key Position Selection in Curved Tunnels 2005
Design Review Boards—Current State of Practice 2004
Fast-Track Design and Installation of a 30-inch Casing Pipe Crossing of the Ventura… 2004
Multiple Tunnels in Soil with Shotcrete Linings on Tren Urbano, San Juan, Puerto… 2004
Slurry Walls Accelerate Shaft Construction in Rock in Los Angeles 2004
Chattahoochee Tunnel 2003
Connection of the Second Manapouri Tailrace Tunnel 2003
New Methods for Building Protection from Settlement Due to Underground Transit Transit… 2003
Portland, Oregon’s Alternative Contract Approach to Tackle a Complex Undergound… 2003
Predicted and Observed Groundwater Into Two Rock Tunnels 2003
Riverside Badlands Tunnel, Inland Feeder Project: The Challenges Between Concept… 2003
Behavior of a Single Gasket System for a Precast Concrete Segmental Liner Subject… 2002
Cost Estimating for Underground Transit: Too Dangerous to “Guesstimate” 2002
Design and Construction of a Deep Excavation for the Lake Mathews Outlet Facilities… 2002
NATM in Soft-Ground: A Contradiction of Terms? 2002
Proposed Revisions to the Differing Site Condition Clause 2002
Structural Design and Testing of a Bolted and Gasketed Pre-Cast Concrete Segmental… 2002
An Approach to the Classification of Weak Rock for Tunnel Projects 2001
Design and Construction of a Large Diameter Wine Cave in Weak Rock 2001
Design and Construction Performance of a Large Diameter Tunnel—Soft-Ground—The… 2001
Engineering Geology and Ground Improvement of the Islais Creek Tunnels, San Francisco… 2001
Hong Kong Strategic Sewage Disposal Scheme Stage I Deep Tunnels 2001
M5 East Tunnels: A Flat Roofed, Bolt and Shotcrete-Lined Highway 2001
New Developments in Microtunneling 2001
Overcoming Difficult Ground Conditions in San Francisco—The Richmond Transport… 2001
Seismic Upgrades of the Claremont Tunnel 2001
Tunneling At Hollywood Reservoir 2001
Tunneling Through Cobbles In Sacramento, California 2001
Ensuring Your Contractor Is Qualified. Part 1. The What Question: Establishing Qualification… 2000
Ensuring Your Contractor Is Qualified. Part 2. The Time Question: When To Determine… 2000
Hollywood Water Quality Improvement Project Construction 2000
Public Policies Keep Small Firms from Competing 2000
Underground Design-Build Contract Delivery: The Designer's Perspective 2000
Betting on the Baseline 1999
City of Los Angeles Large-Diameter Interceptor Sewer Tunnels 1999
Design Methodology Used for the Lake Mathews Outlet Facilities Project 1999
Freezing to Tanking: Challenges of the City Link Driven Tunnels 1999
Tunneling on the Tren Urbano Project, San Juan, Puerto Rico 1999
Site Investigations: A Guide 1998
Design and Construction of the New Tunnel at Genting Sempah, Malaysia 1997
Design of the Metrowest Pressure Tunnel 1997
Fremont Sewer Replacement 1997
Primary Support Design for Large Span Tunnels in Weak Rock: The Melbourne City Link… 1997
A Scheduling Tool for Tunnel Construction 1996
Construction & Performance of Jet Grout Supported Soldier Pile Tremie Concrete Walls… 1996
Design Challenges of the San Bernardino Mountains Tunnels along the Inland Feeder… 1996
The Three-Category Submittal Review Process 1996
San Francisco CSO 1995
Precast Concrete Segmental Linings—Practical Considerations 1987
Some Tunnel Failures and What They Have Taught 1975
An Innovation in Machine Tunneling 1974
Ground Support Prediction Model RSR Concept 1974

©2009 Jacobs Associates, All Rights Reserved Worldwide. Legal Disclaimer

Site by SKAGGS