| Construction of a Mixed Face Reach through Granitic Rocks and Conglomerate |
2007 |
| Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, RI |
2007 |
| Excavation and Support of a Water Tunnel through the Hayward Fault Zone |
2007 |
| Evaluation of Large Tunnels in Poor Ground – Alternative Tunnel Concepts for the Transbay Downtown Rail Extension Project |
2007 |
| Joint Water Pollution Control Plant Tunnel and Ocean Outfall Project |
2007 |
| Microtunnelling to Help Clean up Portland’s Willamette River |
2007 |
| New Test Methodology for Estimating the Abrasiveness of Soils for TBM Tunnelling |
2007 |
| Planning and Design of the Bay Tunnel |
2007 |
| Preliminary Design of the Caldecott Fourth Bore |
2007 |
| Portland, Oregon’s Alternative Contract Approach – A Final Summary |
2007 |
| Global and Structural Stability Assessments of Fort Mason Tunnel for Seismic Rehabilitation |
2006 |
| Role of Engineering Geology on Rehabilitation of Likelike Highway Wilson Tunnel |
2006 |
| Portland, Oregon’s Other CSO Tunnels |
2005 |
| Seismic Design Measures for the Retrofit of the Claremont Tunnel |
2005 |
| Trapezoidal Tapered Ring—Key Position Selection in Curved Tunnels |
2005 |
| Design
Evaluations for the San Vicente Pipeline Tunnel |
2005 |
| Design
of the Brightwater Conveyance Tunnels |
2005 |
| King
County’s Project Delivery Approach for the Brightwater Project |
2005 |
| Secondary
Grouting at the Chattahoochee Tunnel |
2005 |
| Pre-Excavation
Grouting Design Guidelines for Hard Rock Excavations |
2005 |
| Problems
Encountered on the Upper Reach of the Northeast Interceptor
Sewer Project |
2005 |
| Portland,
Oregon’s Alternative Contract Approach—A Work in Progress |
2005 |
| Design
Review Boards—Current
State of Practice. |
2004 |
| Slurry
Walls Accelerate Shaft Construction in Rock in Los Angeles |
2004 |
| Fast-Track Design and Installation of a 30-Inch Casing Pipe Crossing the Ventura River |
2004 |
| Multiple Tunnels in Soil with Shotcrete Linings
on Tren Urbano, San Juan, Puerto Rico |
2004 |
| Predicted
and Observed Groundwater Inflows into Two Rock Tunnels |
2003 |
| New
Methods for Building Protection from Settlement Due to Underground
Transit Construction |
2003 |
| Riverside Badlands Tunnel, Inland Feeder
Project: The Challenges Between Concept and Completion |
2003 |
| Chattahoochee Tunnel |
2003 |
| Portland, Oregon's Alternative Contract Approach
to Tackle a Complex Underground Project |
2003 |
| Connection of the Second Manapouri Tailrace
Tunnel |
2003 |
| Structural
Design and Testing of a Bolted & Gasketed Pre-cast Concrete
Segmental Lining |
2002 |
| Design
and Construction of a Deep Excavation for Lake Matthews Outlet
Facilities Project |
2002 |
| Behavior
of a Single Gasket System for a Precast Concrete Segmental
Liner Subject to High External Hydrostatic
Pressure |
2002 |
| Proposed
Revisions to the Differing Site Condition Clause |
2002 |
| NATM
In Soft-Ground: A Contradiction of Terms? |
2002 |
| Cost
Estimating for Underground Transit: Too Dangerous to "Guesstimate" |
2002 |
| Design
and Construction Performance of a Large Diameter Tunnel—Soft-Ground—The
Stacked Drift Method |
2001 |
| An
Approach to the Classification of Weak Rock for Tunnel Projects |
2001 |
| Design
and Construction of a Large Diameter Wine Cave in Weak Rock |
2001 |
| Hong
Kong Strategic Sewage Disposal Scheme Stage I Deep Tunnels |
2001 |
| Engineering Geology and Ground Improvement of the Islais Creek Tunnels, San Francisco County, California |
2001 |
| Tunneling
at Hollywood Reservoir |
2001 |
| Seismic
Upgrades of the Claremont Tunnel |
2001 |
| Tunneling
through Cobbles in Sacramento, California |
2001 |
| M5
East Tunnels: A Flat Roofed, Bolt and Shotcrete-Lined Highway |
2001 |
| Overcoming Difficult Ground Conditions in
San Francisco—The
Richmond Transport Tunnel |
2001 |
| New Developments in Microtunneling |
2001 |
| Public Policies Keep Small Firms from Competing |
2000 |
| Underground
Design-Build Contract Delivery: The Designer's Perspective |
2000 |
| Ensuring
Your Contractor Is Qualified. Part 1. The What Question: Establishing
Qualification Criteria |
2000 |
| Ensuring
Your Contractor Is Qualified. Part 2. The Time Question:
When
to Determine Qualifications |
2000 |
| Hollywood
Water Quality Improvement Project Construction |
2000 |
| Betting on the Baseline |
1999 |
| Tunneling
on the Tren Urbano Project, San Juan, Puerto Rico |
1999 |
| Design
Methodology Used for the Lake Mathews Outlet Facilities
Project |
1999 |
| City of Los
Angeles Large-Diameter Interceptor Sewer Tunnels |
1999 |
| Freezing
to Tanking: Challenges of the City Link Driven Tunnels |
1999 |
| Site Investigations:
A Guide |
1998 |
| Impact of Environmental Regulations on Groundwater
Discharges in Tunnel |
1998 |
| Design
and Construction of the New Tunnel at Genting Sempah, Malaysia |
1997 |
| Primary
Support Design for Large Span Tunnels in Weak Rock: The
Melbourne City Link Tunnels |
1997 |
| Fremont
Sewer Replacement |
1997 |
| Design
of the Metrowest Pressure Tunnel |
1997 |
| Construction & Performance
of Jet Grout Supported Soldier Pile Tremie Concrete Walls in
Weak Clay |
1996 |
Design
Challenges of the San Bernardino Mountains Tunnels along
the Inland Feeder
|
1996 |
| The Three-Category
Submittal Review Process |
1996 |
| A Scheduling
Tool for Tunnel Construction |
1996 |
| San Francisco CSO |
1995 |
Precast
Concrete Segmental Linings—Practical
Considerations
|
1987 |
| Some Tunnel Failures
and What They Have Taught |
1975 |
| Ground Support Prediction
Model RSR Concept |
1974 |
| An
Innovation in Machine Tunneling |
1974 |