Excavation and Support of a Water Tunnel through the Hayward Fault Zone
2007
Rapid Excavation and Tunneling Conference (RETC) Proceedings
Sarah Holtz Wilson
Jacobs Associates
David F. Tsztoo
East Bay Municipal Utility District
Carl R. Handford
Atkinson Construction
Kenneth Rossi
EPC Consultants
|

The East Bay Municipal Utility District’s Claremont Tunnel is an 18,000-foot long water tunnel built in 1929. The Claremont Tunnel Seismic Upgrade Project involved the construction of a bypass tunnel through the Hayward Fault zone, including an enlarged vault section designed to accommodate up to 8.5 feet of horizontal offset. Notable aspects include challenging and squeezing ground conditions, and a special excavation and support sequence.
|