About People and Projects Brief Introduction Current Opportunities What We Do Current & Past Projects Publications Call or Write Jacobs Associates Home Page


Tunneling At Hollywood Reservoir


2001

G. Colzani
Jacobs Associates

J. Strid
Underground Construction Managers

S. Cole
Los Angeles Department of Water and Power

D. Olsen
Elmore Pipe Jacking

 


Hong Kong’s Strategic Sewage Disposal Scheme (SSDS) Stage I involves the provision of a system of deep tunnels for transporting to a central treatment works wastewater collected from a number of catchments around Victoria Harbour. For the SSDS Stage I works, about 24 km of tunnels have been excavated in hard rock at depths ranging from about 80 to 150 m below Victoria Harbour and the surrounding heavily developed areas of Kowloon and Hong Kong. Five tunnel boring machines (TBMs) with diameters ranging from 3.2 m to 4.3 m were used to excavate the tunnels. Tunnel excavation has been completed and tunnel linings are in progress. Major tunnelling issues such as ground stabilisation and water control encountered in the project are summarised. An overview of one of the possible future tunnel systems that might be adopted in subsequent stages of SSDS is also presented.


Related Projects:
Hollywood Water Quality Improvement Program