About People and Projects Brief Introduction Current Opportunities What We Do Current & Past Projects Publications Call or Write Jacobs Associates Home Page


Design And Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift Method


Victor S. Romero
Jacobs Associates

Paul H. Madsen
Kiewit Construction Co.

 


The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geotechnical conditions consisted of weak rock and highly weathered, unstable alluvial soils. Due to low cover, reinforcement of the arch was required. Ground behavior ranged from firm ground to mixed-face to raveling and flowing ground. Consequently, construction of the individual drifts involved many different soft-ground techniques such as steel set supports, shotcrete support, shield tunneling, forepoling, and consolidation grouting. During construction, the design was modified to improve constructability. Although settlement was experienced during excavation of the drifts, arch movements were within predicted limits and minimal surface settlement was observed upon excavation of the interior.